Office Move Checklist for Phones and Network

Internet, number porting, cabling and the 911 address need calendar time. Do not leave them for the last day.

Moving an office is when phone numbers, internet, cabling and 911 addresses all have to change in the same week if nobody plans them. This checklist is for Phoenix-metro commercial moves. Use it with C13 if we already support your phones, or as a starting point if you are hiring us for the new space.

Four to eight weeks out (sooner if you can)

  • Confirm the move-in date, early-access date and building rules: certificates of insurance, elevator reservations, after-hours work, and who has the MDF or riser key.
  • Order business internet at the new address immediately. A new fiber or coaxial install is often the longest item on the list.
  • If you need new cabling, a rack, Wi-Fi drops, cameras or door access, schedule a site walk while the suite is still easy to work in.
  • Start number porting paperwork if you are keeping existing business numbers. You will usually need a recent bill and an authorized letter of agency. Ports have a scheduled date; they are not instant.
  • For cloud phones, plan the 911 / E911 registered address update so emergency calls from the new office report the new location. This is not optional, and it is easy to forget in the shuffle. See our Cloud Phone Service Terms for 911 limitations.
  • Inventory phones, switches, the firewall and camera or door hardware you plan to take with you. Label desk phones by extension before they go in a box.

The week of the move

  • Test jacks and the closet in the new space. Have a labeled patch plan so move-in day is not a pile of cords.
  • Confirm the internet install date and that someone will be there to meet the provider.
  • Confirm the number-port date and a rollback plan if a port has to be delayed.
  • Update the auto attendant greeting and, if needed, a temporary “we have moved” message. Arizona does not observe daylight saving; schedule everything in local time.
  • Pack a small “day-one” kit: a few labeled phones, spare patch cords, and login information for the firewall and the customer portal.

Cutover day and the day after

  1. As soon as the lease or move date is firm, walk the new space (or send a floor plan) and confirm closet, riser and building-access rules with the landlord.
  2. Order business internet at the new address. Installation appointments can take weeks, and cloud phones and cameras both depend on the circuit being live.
  3. Tell C13 you are moving so we can plan number porting, the phone cutover, cabling and, for cloud phones, the 911 / E911 registered address at the new location.
  4. Have existing cable at the new space tested. Reuse what meets the need; add drops, racks and Wi-Fi or camera cabling where the new layout is short.
  5. Do not cancel the old internet or phone service until the new circuit is up and, if you are porting numbers, the port has completed.
  6. On cutover day, test inbound and outbound calls, the auto attendant, voicemail, 911 address confirmation as applicable, and cameras or door access if they moved with you.
  • Place and receive a test call on the main number and on a few extensions, from a desk phone and from the CoreNexa app if you use it.
  • Walk the auto attendant menu and leave a voicemail to confirm it arrives in the right place.
  • Confirm cameras, door access and Wi-Fi in the new layout — a camera aimed at the old reception desk does not help anyone.
  • Keep the old circuit alive until you are sure the new one is stable, then cancel it.
Have C13 walk both spaces with you. Call (480) 397-2627 or send a message. We can keep your current system running at the old office until the cutover, then install or move phones, cable and cameras at the new one.
Not sure, or short on time? Call C13 at (480) 397-2627 or email us at [email protected], and we'll walk you through it or make the change remotely.

Questions we hear a lot

When should we cancel the old internet?

Only after the new circuit is up, numbers have ported if they needed to, and you have placed test calls from the new office. Canceling early is a common way to lose both internet and phone service on move day.

We are staying on a Nortel or Avaya system. Does this still apply?

Yes, especially the cabling, the closet and the internet if you also have other services. Number moves and any new lines still need lead time. We can relocate a legacy system or use the move as a planned cutover to cloud phones.

Who updates the 911 address?

For C13 cloud phones, tell us as soon as the move is scheduled and we will handle the registered address with you. You are still responsible for making sure the address is correct and for understanding 911 limitations in the cloud phone terms.

Related guides

Related services: Structured cabling · Service areas

Need a hand from a local technician?

C13 serves Phoenix-metro businesses only, so when a phone call or remote change won't fix it, a C13 technician can come to your office. Commercial clients only.

Requests sent outside business hours (Monday–Friday, 8:00 AM–5:00 PM Arizona time, closed on holidays) are handled as after-hours work and billed at 1.5x our standard hourly rate; holidays and emergencies are billed at 2x. We respond within 2 to 4 hours after your email is read. For an emergency, email [email protected] with EMERGENCY in the subject line, or call (480) 397-2627.

Last reviewed November 2026. Product names and trademarks belong to their respective owners; C13 is an independent service provider.

📞 CallInstant QuoteLogin